
October 10, 2017
Phase IV of the project will complete a 1,200-foot section between Falls Bridge Lane and Seneca Road of a continuous 4.2-mile trail along the north side of Georgetown Pike in Great Falls. The walkway is to be 6-foot-wide asphalt. Construction is scheduled for the summer of 2020.
Comments
Use the comment form below to begin a discussion about this content.
Sign in to comment
Or login with:
OpenID